西班牙&E’s Renewable Auction Mechanism 五月 2013 RFO Seeking RAM Power Purchase Agreements

圣地亚哥天然气 & 电力公司(可持续发展目标&E) is issuing this fourth Request for Offers (RFO) in support of its Renewable Auction Mechanism (RAM).  This RFO is issued to solicit offers from eligible energy generators (Respondents).  通过答复,受访者受到本RFO条款的约束.

The RAM, approved by the California Public Utilities Commission (CPUC) in Decision (D.) 10-12-048,并经决议E-4414修改, 决议e - 4489, 决议e - 4546, 和E-4582号决议, RAM决策), 补充国家可再生能源投资组合标准(RPS)计划, 补充加州太阳能倡议(CSI)计划, promotes small-scale renewable development and may present local employment potential in California.  西班牙&E的RAM程序包含了RAM决策的指令.  西班牙&E’s RAM program is designed to procure a total of 155 MW over the course of five solicitations.  西班牙&E的第一, 第二个, 第三RAM征集, 十一月举行, 2011, 五月, 2012, 及2012年11月, 导致了大约85兆瓦的采购, leaving approximately 70 MW to procure over the course of the next two solicitations.

西班牙&E公司打算在本次招标中采购47兆瓦的电力, 15 and 20-year RAM Power Purchase Agreements (PPAs) with Independent Power Producers.  西班牙&E不要求竞标可再生能源信用额度, feed-in-tariff projects or other RPS procurement activities that currently exist or are being contemplated.

Winning Respondents shall enter into a non-negotiable PPA for bundled renewable energy deliveries from eligible renewable resources that can meet the criteria described in the RFO documents (provided below).

征集协议:

Details regarding the solicitation process and eligibility requirements are provided in the RFO document below.

所需表格及文件

Respondents may submit offers to this solicitation by submitting the forms listed below (note the exception in regards to the PPA形式 as further described below).  表格可在《全球知名十大博彩公司》网站上查阅.  The failure to provide the required information may result in the offer being deemed non-conforming and may disqualify the offer from further consideration.

  • 项目说明表格 (医生)
    每个项目提交一份.

  • Pricing Form – may submit two pricing options per project (one showing Energy Only pricing and another showing Full Capacity Deliverability Status pricing)

  • 现场控制文件

  • Copy of interconnection agreement, most recent study results or equivalent Fast Track documentation.

  • PPA形式 (医生)
    PPA表格包括一些提供选项的条款(例如.g. 10年、15年或20年的期限).  不提供选项的术语是 不可更改.  Respondents DO NOT have to provide a redline of the PPA形式 in their offers.  被选中和入围的投标将从可持续发展集团收到&E, 作为中标者通知的一部分, a FORM RAM PPA that is redlined to reflect the relevant provisions that are applicable to the proposed project as indicated by Respondent in their 项目说明表格.

Any party interested in submitting an offer must submit the offer via electronic mail (e-mail) to (电子邮件保护), which is the RAM RFO inbox, and attach all required forms and bid materials to the e-mail.  电子邮件的主题应如下: 可持续发展目标投标&E的2013年5月RAM RFO.  A reply e-mail from the RAM RFO inbox will be sent to the email address submitting the offer to confirm receipt of the offer.  所有优惠必须在下午12点前以电子邮件发送.m. (i.e. 中午),太平洋标准时间,截止日期, 2013年6月28日 (见RAM RFO计划表).

The 项目说明表格 must be in Word or Word-compatible format (not in PDF).  The Pricing Form must be in Excel or Excel-compatible format (not in PDF).  The interconnection and site control documentation must be submitted in PDF format.

RFO沟通

All questions or other communications regarding this RFO should be submitted via e-mail to (电子邮件保护).  所有问题和答案将匿名发布在本网站上.  西班牙&E will not accept questions or comments in any other form, except during the pre-bid conference.  Respondents are encouraged to check this RFO Website periodically for updates, notices, and postings.

加拿大钾肥会议

西班牙&E将通过网络会议召开一次标前会议.  标前会议将于 2013年5月29日下午1点到5点.  如果你打算加入,请发邮件 (电子邮件保护), by 5月23日星期四, and provide your company name and a list of attendees including their full names and contact information.  请将每间公司的代表人数限制为两名.

2013年5月RAM RFO投标前会议
事件参考: 1615314
日期: 2013年5月29日-太平洋标准时间下午1:00

标前会议介绍
观众链接: http://icsus.meeting-stream.com/052913_Sempra_1615314/

与会者拨入(免费)*:(866) 793-1340

Web conference participation instructions for the pre-bid conference will be updated shortly.  Please check the RAM RFO website periodically for updates, notices and postings.

*Participation in the pre-bid conference is NOT mandatory in order to submit an offer.

RFO公告

请定期查看本网站作为可持续发展目标&E will post all solicitation announcements, including scheduling changes or RFO amendments if any.

投标前会议的问题和答案 (pdf)

提交报价

Any party interested in submitting an offer must submit the offer via e-mail to (电子邮件保护),电子邮件的主题如下: 可持续发展目标投标&E的2013年5月RAM RFO.  所有报价必须在下午12点之前通过电子邮件发送.m. (i.e. 中午),太平洋标准时间,截止日期, 2013年6月28日 (见《全球知名十大博彩公司》附表).  A reply email from the RAM RFO inbox will be sent to the email address submitting the offer to confirm receipt of the offer.  如果受访者在使用电子邮件时遇到技术困难, 他们应该提供这些困难的证据.g. a screen shot of the error message) and email the bid again to the RAM RFO inbox by 1:00 p.m.截止日期为美国太平洋标准时间.  If the Respondent encounters further technical difficulties with the RAM RFO inbox, 他们应该提供这些困难的证据.g. a screen shot of the error message or a sent email notice with a time stamp before 1:00 p.m. (截止日期)及 提交一份硬拷贝和一张光盘 可持续发展目标一揽子计划的一部分&E and the Independent Evaluator at the addresses below by close of business on the day following the Closing Date.

 

  • 圣地亚哥天然气 & 电力公司
    电力及燃气采购部
    注意:RAM征集
    世纪公园苑8315号,CP-21D
    圣地亚哥,加州92123-1548

  • 芭芭拉沙
    PA咨询集团
    林肯街1700号,4600套房
    丹佛,CO 80203

以下时间表和截止日期适用于本RFO. 西班牙&E保留随时在西班牙修改此时间表的权利&E自行决定. Respondents are responsible for accessing the RFO website for updated schedules and possible amendments to the RFO or the solicitation process.

NO.

日期

1.

RFO发布

2013年5月20日

2.

出价前的会议

2013年5月29日

3.

西班牙&E开始接受投标

2013年6月3日

4.

提交问题的截止日期
问题提交截止日期.
所有问题的答案将发布在可持续发展目标上&E的网站不迟于13年6月14日.

2013年6月6日

6.

提交公羊报价截止日期/截止日期
报价必须通过电子邮件发送至 (电子邮件保护) 不迟于太平洋标准时间中午

2013年6月28日

7.

中标人须知

2013年9月6日

8.

投标人接受/退出信
来自中标人的款项,注明:

  1. 退出可持续发展目标&E’s solicitation; OR
  2. Acceptance of standing as a winning bid; withdrawal from participating in any other solicitation and evidence of withdrawal notice to all other solicitors

2013年9月13日

9.

西班牙&E向落选的应答者发出感谢通知

2013年10月18日

10.

为目标47mw执行ppa

2013年10月18日

11.

西班牙&E向CPUC提交带ppa的Tier 2建议信以获得批准

2013年11月22日

12.

预期CPUC批准

2013年12月23日

956.17 KB
PDF
2013年5月RAM RFO
2013年5月RAM RFO
185.50 KB
医生
项目说明表格
项目说明表格
85.21 KB
XLSX
非高峰和/或基本负荷表
非高峰和/或基本负荷表
84.82 KB
XLSX
巅峰状态
巅峰状态
444.50 KB
医生
PPA形式
PPA形式
2.15 MB
PDF
标前会议介绍
标前会议介绍
65.23 KB
PDF
投标前会议的问题和答案
投标前会议的问题和答案